3D geometric constraint analysis and its application on the spatial assembly sequence planning
暂无分享,去创建一个
[1] Y. Xiong,et al. A hierarchical approach to generating precedence graphs for assembly planning , 2003 .
[2] Arthur C. Sanderson,et al. A correct and complete algorithm for the generation of mechanical assembly sequences , 1989, Proceedings, 1989 International Conference on Robotics and Automation.
[3] Márta Szilvási-Nagy,et al. Two Algorithms for Decomposing a Polyhedron into Convex Parts , 1986, Comput. Graph. Forum.
[4] D. Wilde,et al. A Convergent Convex Decomposition of Polyhedral Objects , 1992 .
[5] Wynne Hsu,et al. Feedback approach to design for assembly by evaluation of assembly plan , 1993, Comput. Aided Des..
[6] Robert B. Jerard,et al. C-space approach to tool-path generation for die and mould machining , 1997, Comput. Aided Des..
[7] Dinesh Manocha,et al. OBBTree: a hierarchical structure for rapid interference detection , 1996, SIGGRAPH.
[8] Shana Smith,et al. Case study: the impact of assembly reorientations on assembly time , 2006 .
[9] G. Boothroyd,et al. Assembly Automation and Product Design , 1991 .
[10] Joseph S. B. Mitchell,et al. Efficient Collision Detection Using Bounding Volume Hierarchies of k-DOPs , 1998, IEEE Trans. Vis. Comput. Graph..
[11] A. N. Poo,et al. Oriented bounding box and octree based global interference detection in 5-axis machining of free-form surfaces , 2004, Comput. Aided Des..
[12] Han Ding,et al. Visibility theory and algorithms with application to manufacturing processes , 2000 .
[13] Randall H. Wilson. Minimizing user queries in interactive assembly planning , 1993, [1993] Proceedings IEEE International Conference on Robotics and Automation.
[14] Tomás Lozano-Pérez,et al. Automatic Planning of Manipulator Transfer Movements , 1981, IEEE Transactions on Systems, Man, and Cybernetics.
[15] David R. Owen,et al. SMB: Collision detection based on temporal coherence , 2006 .
[16] Arthur C. Sanderson,et al. Two criteria for the selection of assembly plans: maximizing the flexibility of sequencing the assembly tasks and minimizing the assembly time through parallel execution of assembly tasks , 1991, IEEE Trans. Robotics Autom..
[17] Luc Laperri. GAPP: A Generative Assembly Process Planner , 2003 .
[18] Qiang Su. Computer aided geometric feasible assembly sequence planning and optimizing , 2007 .
[19] Geoffrey Boothroyd,et al. Product design for manufacture and assembly , 1994, Comput. Aided Des..
[20] Jing Fan,et al. Intelligent virtual assembly planning with integrated assembly model , 2003, SMC'03 Conference Proceedings. 2003 IEEE International Conference on Systems, Man and Cybernetics. Conference Theme - System Security and Assurance (Cat. No.03CH37483).
[21] R.H. Wilson,et al. On constraints in assembly planning , 1998, IEEE Trans. Robotics Autom..
[22] Carme Torras,et al. 3D collision detection: a survey , 2001, Comput. Graph..
[23] Thomas L. DeFazio,et al. An integrated computer aid for generating and evaluating assembly sequences for mechanical products , 1991, IEEE Trans. Robotics Autom..
[24] Tony C. Woo,et al. Visibility maps and spherical algorithms , 1994, Comput. Aided Des..