Automatic Realignment of Defective Assemblies Using an Inverse Kinematics Analogy

AbstractAlignment and plumbness of construction assemblies is a challenging and fundamental problem because it relies on manual solutions to the underlying geometric feedback control problems inherent in practices such as pipefitting and steel structures erection. Where defective components and segments are not well controlled, the errors propagate in larger components and therefore cause more severe challenges and large costs consequently. This paper presents a framework for automatic and systematic development of realignment actions required to achieve a desired state by employing and combining two theories: (1) three-dimensional (3D) imaging that enables the identification of the as-built status and then quantification of incurred discrepancies as a feedback signal by comparing the captured as-built status with the designed state existing in the building information model (BIM), and (2) an inverse kinematics analogy that results in the calculation of required changes in the degrees of freedom defined w...

[1]  Hans Martin Kjer,et al.  Evaluation of surface registration algorithms for PET motion correction , 2010 .

[2]  Seokho Chi,et al.  Image-Based Safety Assessment: Automated Spatial Safety Risk Identification of Earthmoving and Surface Mining Activities , 2012 .

[3]  Fei Dai,et al.  Comparison of Image-Based and Time-of-Flight-Based Technologies for Three-Dimensional Reconstruction of Infrastructure , 2013 .

[4]  Carl T. Haas,et al.  Automatic Detection of Cylindrical Objects in Built Facilities , 2014, J. Comput. Civ. Eng..

[5]  Ioannis Brilakis,et al.  Comparison of Optical Sensor-Based Spatial Data Collection Techniques for Civil Infrastructure Modeling , 2009 .

[6]  Julio C. Martinez,et al.  Visualizing Simulated Construction Operations in 3D , 2001 .

[7]  Thomas Bock Construction robotics , 2007, Auton. Robots.

[8]  Fernanda Leite,et al.  Evaluation of accuracy of as-built 3D modeling from photos taken by handheld digital cameras , 2012 .

[9]  Changmin Kim,et al.  Automated construction progress measurement using a 4D building information model and 3D data , 2013 .

[10]  Simaan M. AbouRizk,et al.  A framework for an automated and integrated project monitoring and control system for steel fabrication projects , 2011 .

[11]  Yasser Abdel-Rady I. Mohamed,et al.  A dynamic programming solution to automate fabrication sequencing of industrial construction components , 2014 .

[12]  Mohamed Al-Hussein,et al.  Simulation‐based scheduling of module assembly yards: case study , 2007 .

[13]  Soon-Wook Kwon,et al.  Fitting range data to primitives for rapid local 3D modeling using sparse range point clouds , 2004 .

[14]  Simaan M. AbouRizk,et al.  Large-scale simulation modeling system for industrial construction , 2009 .

[15]  Marc Levoy,et al.  Efficient variants of the ICP algorithm , 2001, Proceedings Third International Conference on 3-D Digital Imaging and Modeling.

[16]  Mani Golparvar-Fard,et al.  Evaluation of image-based modeling and laser scanning accuracy for emerging automated performance monitoring techniques , 2011 .

[17]  Mani Golparvar-Fard,et al.  Automated Progress Monitoring Using Unordered Daily Construction Photographs and IFC-Based Building Information Models , 2015, J. Comput. Civ. Eng..

[18]  Frédéric Bosché,et al.  Tracking the Built Status of MEP Works: Assessing the Value of a Scan-vs-BIM System , 2014, J. Comput. Civ. Eng..

[19]  Burcu Akinci,et al.  A formalism for utilization of sensor systems and integrated project models for active construction quality control , 2006 .

[20]  Mohamed Al-Hussein,et al.  Automated post-simulation visualization of modular building production assembly line , 2012 .

[21]  S. V. Sreenivasan,et al.  Position error modeling for automated construction manipulators , 2004 .

[22]  Eugeniusz Budny,et al.  Robotics in Civil Engineering , 1988 .

[23]  Burcu Akinci,et al.  Automatic Reconstruction of As-Built Building Information Models from Laser-Scanned Point Clouds: A Review of Related Techniques | NIST , 2010 .

[24]  Silvio Savarese,et al.  Application of D4AR - A 4-Dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication , 2009, J. Inf. Technol. Constr..

[25]  Yasser Abdel-Rady I. Mohamed,et al.  Pipe spool fabrication sequencing by automated planning , 2012 .

[26]  Carl T. Haas,et al.  Considering prework on industrial projects , 2005 .

[27]  Xiangyu Wang,et al.  Using Augmented Reality to Facilitate Piping Assembly: An Experiment-Based Evaluation , 2015, J. Comput. Civ. Eng..

[28]  Mani Golparvar-Fard,et al.  Research in Visualization Techniques for Field Construction , 2011 .

[29]  Paul J. Besl,et al.  A Method for Registration of 3-D Shapes , 1992, IEEE Trans. Pattern Anal. Mach. Intell..

[30]  Changmin Kim,et al.  Skeleton-based 3D reconstruction of as-built pipelines from laser-scan data , 2013 .

[31]  J. Denavit,et al.  A kinematic notation for lower pair mechanisms based on matrices , 1955 .

[32]  Burcu Akinci,et al.  Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects , 2006 .

[33]  Bon-Gang Hwang,et al.  Measuring the Impact of Rework on Construction Cost Performance , 2009 .

[34]  Edward J. Jaselskis,et al.  Modularization and assembly algorithm for efficient MEP construction , 2011 .

[35]  Frédéric Bosché,et al.  Automated progress tracking using 4D schedule and 3D sensing technologies , 2012 .

[36]  Burcu Akinci,et al.  Automatic Creation of Semantically Rich 3D Building Models from Laser Scanner Data , 2013 .

[37]  E. S. Slaughter,et al.  Simulation of structural steel erection to assess innovations , 1997 .

[38]  Lucio Soibelman,et al.  Shape-Based Retrieval of Construction Site Photographs , 2008 .

[39]  Carl T. Haas,et al.  Automated assembly discrepancy feedback using 3D imaging and forward kinematics , 2015 .

[40]  Carl T. Haas,et al.  Automated 3D compliance checking in pipe spool fabrication , 2014, Adv. Eng. Informatics.

[41]  Ioannis Brilakis,et al.  Progressive 3D reconstruction of infrastructure with videogrammetry , 2011 .

[42]  Changmin Kim,et al.  Fully automated registration of 3D data to a 3D CAD model for project progress monitoring , 2013 .

[43]  Mani Golparvar-Fard,et al.  Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs , 2009 .

[44]  Carl T. Haas,et al.  Multisensor data fusion for on-site materials tracking in construction , 2010 .

[45]  Burcu Akinci,et al.  Modeling and analyzing the impact of technology on data capture and transfer processes at construction sites: A case study , 2006 .

[46]  Carlos H. Caldas,et al.  Experiments in real-time spatial data acquisition for obstacle detection , 2005 .

[47]  Iris D. Tommelein,et al.  APPLICATION OF TOLERANCE MAPPING IN AEC SYSTEMS , 2005 .

[48]  Ying Wang,et al.  Integrating Augmented Reality with Building Information Modeling: Onsite construction process controlling for liquefied natural gas industry , 2014 .

[49]  Jie Gong,et al.  An object recognition, tracking, and contextual reasoning-based video interpretation method for rapid productivity analysis of construction operations , 2011 .

[50]  Sanjiv Singh,et al.  The State of the Art in Automation of Earthmoving , 1997 .

[51]  Ping Wang,et al.  Flow Production of Pipe Spool Fabrication: Simulation to Support Implementation of Lean Technique , 2009 .

[52]  George Vosselman,et al.  An integrated approach for modelling and global registration of point clouds , 2007 .

[53]  R. Penrose A Generalized inverse for matrices , 1955 .

[54]  Frédéric Bosché,et al.  Automated retrieval of 3D CAD model objects in construction range images , 2008 .

[55]  Changmin Kim,et al.  Fully Automated As-Built 3D Pipeline Extraction Method from Laser-Scanned Data Based on Curvature Computation , 2015, J. Comput. Civ. Eng..

[56]  Iris D. Tommelein,et al.  Role of Tolerances and Process Capability Data in Product and Process Design Integration , 2003 .

[57]  Frédéric Bosché,et al.  The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components , 2015 .

[58]  Arash Shahi,et al.  Onsite 3D marking for construction activity tracking , 2013 .