4D CAD Drawings based on Marker-based Augmented Reality
暂无分享,去创建一个
[1] Soon-Wook Kwon,et al. Development of Mobile-Based Process and System for Pipe Management of Construction Using NFC(Near Field Communication) and Augmented Reality Technology , 2014 .
[2] Sheryl Staub-French,et al. Visualizing high-rise building construction strategies using linear scheduling and 4D CAD , 2009 .
[3] Vineet R. Kamat,et al. Automated Generation of Operations Level Construction Animations in Outdoor Augmented Reality , 2009 .
[4] Sangyoon Chin,et al. RFID+4D CAD for Progress Management of Structural Steel Works in High-Rise Buildings , 2008 .
[5] Minsu Kang,et al. Development of Improved 4D CAD System for Horizontal Works in Civil Engineering Projects , 2013 .
[6] Xiangyu Wang,et al. Compatibility issues in Augmented Reality systems for AEC: An experimental prototype study , 2006 .
[7] Moon Kyum Kim,et al. Applicability of 4D CAD in Civil Engineering Construction: Case Study of a Cable-Stayed Bridge Project , 2011 .
[8] Feniosky Peña-Mora,et al. Integrated Sequential As-Built and As-Planned Representation with D4AR Tools in Support of Decision-Making Tasks in the AEC/FM Industry , 2011 .
[9] Vacharapoom Benjaoran,et al. An integrated safety management with construction management using 4D CAD model , 2010 .
[10] Mani Golparvar-Fard,et al. Research in Visualization Techniques for Field Construction , 2011 .
[11] Vineet R. Kamat,et al. Scalable Algorithm for Resolving Incorrect Occlusion in Dynamic Augmented Reality Engineering Environments , 2010, Comput. Aided Civ. Infrastructure Eng..
[12] Phillip S. Dunston,et al. Technology development needs for advancing Augmented Reality-based inspection , 2010 .
[13] Meng-Han Tsai,et al. On-Site Building Information Retrieval by Using Projection-Based Augmented Reality , 2012, J. Comput. Civ. Eng..
[14] Phillip S. Dunston,et al. Identification of application areas for Augmented Reality in industrial construction based on technology suitability , 2008 .
[15] Phillip S. Dunston,et al. Evaluation of Augmented Reality in steel column inspection , 2009 .
[16] Byungil Kim,et al. Interactive Modeler for Construction Equipment Operation Using Augmented Reality , 2012, J. Comput. Civ. Eng..
[17] Xiangyu Wang,et al. Using Augmented Reality to Facilitate Piping Assembly: An Experiment-Based Evaluation , 2015, J. Comput. Civ. Eng..
[18] Vineet R. Kamat,et al. Collaborative visualization of engineering processes using tabletop augmented reality , 2013, Adv. Eng. Softw..
[19] Horst Bischof,et al. Augmented Reality for Construction Site Monitoring and Documentation , 2014, Proceedings of the IEEE.
[20] Vineet R. Kamat,et al. Real-Time Occlusion Handling for Dynamic Augmented Reality Using Geometric Sensing and Graphical Shading , 2013 .
[21] Chung-Wei Feng,et al. Using the MD CAD model to develop the time–cost integrated schedule for construction projects , 2010 .
[22] Hyoun-Seok Moon,et al. Improved link system between schedule data and 3D object in 4D CAD system by using WBS code , 2010 .
[23] Ming Lu,et al. Analytical Approach to Augmenting Site Photos with 3D Graphics of Underground Infrastructure in Construction Engineering Applications , 2011, J. Comput. Civ. Eng..
[24] Rahul Kashyap,et al. An evaluation of the applicability of 4D CAD on construction projects , 2010 .
[25] Silvio Savarese,et al. Application of D4AR - A 4-Dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication , 2009, J. Inf. Technol. Constr..
[26] Phillip S. Dunston,et al. Potential of augmented reality as an assistant viewer for computer-aided drawing , 2006 .
[27] Rogier Jongeling,et al. A method for planning of work-flow by combined use of location-based scheduling and 4D CAD , 2007 .
[28] Peter E.D. Love,et al. Using Animated Augmented Reality to Cognitively Guide Assembly , 2013, J. Comput. Civ. Eng..
[29] Bonsang Koo,et al. Feasibility study of 4D CAD in commercial construction , 2002 .
[30] Jia-Ruey Chang,et al. Development of a Road Monitoring and Reporting System Based on Location-Based Services and Augmented-Reality Technologies , 2012 .
[31] Changyoon Kim,et al. 4D CAD model updating using image processing-based construction progress monitoring , 2013 .
[32] David K. H. Chua,et al. Quantification of Spatial Temporal Congestion in Four-Dimensional Computer-Aided Design , 2010 .
[33] Martin Fischer,et al. Areas of Application for 3D and 4D Models on Construction Projects , 2008 .
[34] Hui Wang,et al. Distributed Augmented Reality for Visualizing Collaborative Construction Tasks , 2009 .
[35] Joon Heo,et al. Development of Building Monitoring Techniques Using Augmented Reality , 2009 .
[36] Xiangyu Wang,et al. Mixed Reality-Based Visualization Interfaces for Architecture, Engineering, and Construction Industry , 2005 .
[37] David Heesom,et al. Trends of 4D CAD applications for construction planning , 2004 .